EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Lance's_650B
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (243)
Research
- (2)
Workshop
- (7)
Empennage
- (41)
Fuselage
- (1)
Firewall
Tail Feathers
Wings
- (165)
-
Right Wing Locker...
-
Fuel Sender cover
-
Pitot Heater...
-
Pitot mount work
-
Pitot nut plate...
-
Pitot reinforment...
-
Pitot inspection panel
-
Rt Wing fuel line...
-
Rt wing fuel lines...
-
Rt Wing Fuel Lines...
-
RT Wing fuel lines
-
Rt wing bellcrank...
-
Replaced front rib...
-
Drilled holes for rt...
-
Rt Wing Fuel Sender...
-
Rt Wing Fuel Filler...
-
Rt Wing Fuel Filler...
-
Rt Wing Fuel Sender jig
-
Build wire bundle...
-
Debur right wing top...
-
Drilled Landing...
-
Releveling and...
-
Rt wing tank ProSeal...
-
Rt wing fuel tank...
-
Rt Wing Fuel Tank...
-
Rt Wing Landing...
-
Rt wing landing...
-
Rt Wing Leading Edge...
-
Started drilling rt...
-
rt wing leading edge...
-
Flipped rt wing...
-
Complete lower rt...
-
Rt wing lower skin,...
-
Continue to debur...
-
Debur rt wing inside...
-
Debur debur debur...
-
rt wing lower deskin...
-
Final drilled rt...
-
Rt Wing Lower Spar...
-
Rt Wing Lower Skin...
-
rt wing bottom skin...
-
Drilled and cortec'd...
-
Lay rt wing back on...
-
rt wing bellcrank...
-
Rt Wing top skin...
-
rt wing skin and...
-
Fabricated rt wing...
-
Rt Wing first flip...
-
Finished drilling Rt...
-
Rt Wing fabricate...
-
rt wing top skin...
-
Right Wing top skin...
-
Drilled initial top...
-
Right Wing final...
-
Rt Wing rear spar...
-
Drill wing locker...
-
Cut out wing locker...
-
Rt wing riveting...
-
Rt Wing locker tiedowns
-
RT wing locker prep
-
Right Wing...
-
Right Wing Leading...
-
Right Wing Leading...
-
Right Wing Leading...
-
Nearly finished nose...
-
Rib #7 Right Wing...
-
Start Right Wing
-
Wing move to hanger
-
Packing up the wing...
-
Packing up the wing
-
Wing Sling build
-
Shop cleanup and...
-
Beginning torque...
-
Left Wing support...
-
Left Wing Aileron Stop
-
Wingtip consulation...
-
Wingtip and aileron...
-
Left Aileron placed...
-
L channel down on...
-
Left Wing root nose...
-
Rivet Nose Rib #3...
-
Squeeze rivets,...
-
Reevaluate and...
-
6-K-1-2Fuel Sender...
-
Leading edge ribs...
-
Flaps and Ailerons...
-
Replaced nose rib
-
Left Wing Landing...
-
Finished Landing...
-
Landing Lights mount...
-
Light kit mount build
-
Landing Lights hole cut
-
Fuel_tank_leading_ed...
-
Fuel cap skin cut...
-
Fuel quick drain...
-
Last nose-rib skin...
-
Access Panels
-
Bottom Skin bell...
-
walking skins and...
-
Drilled and cleco'd...
-
Added leading edge...
-
Final drill...
-
Leading edge Left...
-
Riveted rear spar...
-
Rear spar debur and...
-
Final drill and...
-
Left wing main spar...
-
Remove Left Wing...
-
6W11-6 - Rear Wing...
-
Cut and drilled in...
-
Bell Crank support...
-
6W10 - Bell Crank...
-
Flipping the left...
-
Top Skin and rear...
-
Continued drilling...
-
Started Drilling...
-
6W8-2 - Top Wing...
-
First wing skin...
-
Drilled Nose Rib...
-
6W5-2L - Left Wing...
-
Bellcrank and...
-
Rear Wing Rib...
-
Questions for Roger...
-
6W6,6W7 - Attaching...
-
6W7 - Started...
-
6W6 - Cortec Rear Ribs
-
6W6 - Debur and prep...
-
6W6 - Drilled and...
-
6W6 - Rear Rib L...
-
6W6 - Rear Ribs
-
6W7-1 - Joined Rear...
-
6W2 - Aileron...
-
6W2 - Closing up 1st...
-
6W2-2 - Rebuilt...
-
6W2 - Assemble...
-
Cortec Ailerons
-
6W2-5,6W2-6 - Final...
-
6-ATO-1 - Aileron...
-
6-ATO-1 - Aileron...
-
6-ATO-1 - Aileron...
-
6W2-2 - Aileron rib...
-
Aileron Rib Form...
-
6-ATO-1 -...
-
6-ATO-1 - Cut out...
-
6W12 - Left Aileron...
-
6W2 - Drilled Left...
-
6W2 - Disassembled...
-
6W12 - Mass Balancer...
-
6W2 - Mass Balancer...
-
6W2 - Right side...
-
6W1 - Right Flap:...
-
6W1-4 - Drill hinge...
-
6W1-3,1,6,3 - Right...
-
6W1 -Riveting and...
-
6W1 - Finish Cortec...
-
6W1 -...
-
6W1-3 - Flap Control...
-
6W1-1,6W1-2 -...
-
6W1-3 - Control Plate
-
Missing inventory...
-
Finished inventory
-
Started Inventory of...
-
Picked up Wing kit...
-
Wing Kit purchase
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
- (2)
Propeller
Fuel System
- (11)
Interior Finish
Paint / Decals
- (2)
Inspection
- (1)
Tools
- (4)
SPECIAL
- (7)
Builder Name:
Lance Miller
-
Project:
Zenair - CH 650 B
-
VIEW REPORTS
Total Hours:
667.8
Start/Last Date:
Dec 10, 2015 - No Finish Date
Engine:
Corvair 2850
Propeller:
Warp Drive
Panel:
Probably steam gauge + iPad mini mount
Friendly URL:
https://eaabuilderslog.org?s=Lance's_650B
Home or Last Project Picture
Aug 21, 2022
RT wing locker prep
- (3 hours)
Category: Wings
Drilled out rear rib 4 brace rivets so I can rivet through it for inboard locker brace. Also drilled rib 5 for locker rear brace.
RT_wing_locker_backing
drilling out inboard rib brace rivets
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.